Home Archive Contact
PDF download
Cite article
Share options
Informations, rights and permissions
Issue image
Vol 14, Issue 1, 2025
Pages: 273 - 288
Professional paper
See full issue

INTERNACIONALNI UNIVERZITET TRAVNIK U TRAVNIKU
EKONOMSKI FAKULTET TRAVNIK U TRAVNIKU
PRAVNI FAKULTET TRAVNIK U TRAVNIKU
FAKULTET ZA MEDIJE I KOMUNIKACIJE TRAVNIK U TRAVNIKU

u saradnji sa

MIT UNIVERZITET SKOPLJE, SJEVERNA MAKEDONIJA
VEVU, VELEUČILIŠTE LAVOSLAV RUZIČKA U VUKOVARU, HRVATSKA
VELEUČILIŠTE VIMAL, SISAK, HRVATSKA
CKKPI, TRAVNIK, BOSNA I HERCEGOVINA

organizuju

31. MEĐUNARODNU KONFERENCIJU

EKONOMSKE, PRAVNE I MEDIJSKE INTEGRACIJE BOSNE I HERCEGOVINE I ZEMALJA ZAPADNOG
BALKANA KAO KLJUČNI POKRETAČ EUROPSKIH VRIJEDNOSTI

12. – 13. decembar 2025. godine

Metrics and citations
Abstract views: 1
PDF Downloads: 0
Google scholar: See link
Article content
  1. Abstract
  2. Disclaimer
Received: 14.04.2025. >> Accepted: 30.04.2025. >> Published: 16.05.2025. Professional paper

NAPREDNI INŽENJERSKI PRISTUP NA PRIMERU SANACIJE I REKONSTRUKCIJE ČELIČNE KONSTRUKCIJE POSLOVNOG OBJEKTA / ADVANCED ENGINEERING APPROACH TO THE EXAMPLE OF REPAIR AND RECONSTRUCTION OF THE STEEL STRUCTURE OF A BUSINESS FACILITY

By
Ivan Milojević ,
Ivan Milojević

Faculty of Technical Sciences, Architecture, University of Prishtina , Kosovksa Mitrovica , Kosovo

Mirsad Tarić ,
Mirsad Tarić
Veis Šerifi ,
Veis Šerifi

Fakultet politehničkih nauka Travnik, Internacionalni univerzitet Travnik u Travniku , Travnik , Bosnia and Herzegovina

Lidija Babić
Lidija Babić

Faculty of Technical Sciences, Architecture, University of Prishtina , Kosovska Mitrovica , Kosovo

Abstract

The building consists of a ground floor and two floors, the base is 15940 mm wide, 39490 mm long, with ground floor elevations of ±0.00, floors +5.00 m, +11.60 m and a sloping roof with a double slope. The change in the purpose of the building caused the need to change the grid of the columns above the elevation of +5.00 m. The consequence of removing the row of columns above the elevation +5.00 m, leads to a change in the static system by increasing the span of the lattice floor support at the elevation +11.60 m, from two spans 9.0+11.04 m to 21.04 m. The removal of the row of columns without a previous global analysis of the load-bearing capacity and stability of the structure led to excessive deflection of the inter-story structure at an elevation of +11.60 m and deformation of the frames in the longitudinal direction. The reconstruction provided for the removal of the reinforced concrete slab at the +11.60 m level, and by adding new elements to the floor supports, three-band roof trusses were formed. With this reconstruction, the number of floors of the building was changed and it becomes a building with a ground floor and one floor.Renovation of the existing structure envisages strengthening of columns by welding U-profiles, strengthening of the lower belts of floor supports at the level of +5.00 m, installation of additional vertical couplings in the longitudinal and transverse directions. The spatial calculation model was made in Auto desk Robot 2019 software.

The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.